The conceptual design of a new transfer line from booster to recycler for the fermilab proton plan phase 2 campaign

D. E. Johnson, M. Xiao
2007 2007 IEEE Particle Accelerator Conference (PAC)  
Upon the termination of the Fermilab Collider program, the current Recycler anti-proton storage ring (RR) will be converted to a proton pre-injector for the Main Injector (MI) synchrotron. This is scheduled to increase the beam power for the 120 GeV Neutrino program to upwards of 700KW. A transport line that can provide direct injection from the Booster to the Recycler while preserving direct injection from the Booster into the Main Injector and the 8 GeV Booster Neutrino program will be discussed, and its concept design will be presented.
doi:10.1109/pac.2007.4440878 fatcat:u5wjzxuzbrb4vgi6nme6ohbmia