Lunar Lander Offloading Operations Using a Heavy-Lift Lunar Surface Manipulator System

Sharon Jefferies, John Dorsey, William Doggett, Thomas Jones, Scott Angster, Jonathan Chrone, Darrell Caldwell, Michael Haddad
2009 AIAA SPACE 2009 Conference & Exposition   unpublished
This study investigates the feasibility of using a heavy-lift variant of the Lunar Surface Manipulator System (LSMS-H) to lift and handle a 12 metric ton payload. Design challenges and requirements particular to handling heavy cargo were examined. Differences between the previously developed first-generation LSMS and the heavy-lift version are highlighted. An in-depth evaluation of the tip-over risk during LSMS-H operations has been conducted using the Synergistic Engineering Environment and
more » ... ential methods to mitigate that risk are identified. The study investigated three specific offloading scenarios pertinent to current Lunar Campaign studies. The first involved offloading a large element, such as a habitat or logistics module, onto a mobility chassis with a lander-mounted LSMS-H and offloading that payload from the chassis onto the lunar surface with a surface-mounted
doi:10.2514/6.2009-6445 fatcat:fzjuxexp7fc2rjr6kuwzbr4adq