A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL.
The file type is application/pdf
.
Optimal scheduling of jobs with a DHR tail in the M/G/1 queue
2008
Proceedings of the 3rd International Conference on Performance Evaluation Methodologies and Tools
We consider the mean delay optimization in the M/G/1 queue for jobs with a service time distribution that has a tail with decreasing hazard rate (DHR). If the DHR property is valid for the whole distribution, then it is known that the Foreground-Background (FB) discipline, which gives priority to the job with least amount of attained service, is optimal among nonanticipating scheduling disciplines. However, FB may fail to be optimal if the DHR property is valid only for the tail of the
doi:10.4108/icst.valuetools2008.4335
dblp:conf/valuetools/AaltoA08
fatcat:bcef7xgorbb2fbgsycsrakib4e