A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL.
The file type is application/pdf
.
Flexible procedure for concreting in hot and dry climate based on Phase Change Material
2018
MATEC Web of Conferences
The article presents the possibilities of using a flexible approach in designing production processes in construction on an example of concreting in a hot and dry climate. The basic drawback of typical quality management system procedures is their rigidity. It is based on the assumption that building processes are carried out in favorable conditions. Meanwhile, these conditions often change to a large extent during the process, and the accuracy of weather forecasts is limited. The aim of the
doi:10.1051/matecconf/201822201005
fatcat:xo43hgv4pze77k4atmmebkbqkm