THE SECOND HORIZONTAL CONTROL SURVEY OF THE BOOSTER MONUMENT NETWORK
[report]
1993
unpublished
A network of survey control monuments, installed in the Booster tunnel, is used as a geodetic reference to define the locations of the Booster machine magnets in the tunnel. The horizontal positions of the monuments were established in the initial control survey, of July 1989, prior to installation of the magnets. In the autumn of 1990 additional radiation shielding was installed between the AGS and Booster machines, increasing floor loading in the area of installation. A second horizontal
doi:10.2172/1150595
fatcat:jygukihvefefzaeqnkd4e5lq5q