Electronics System of the CMS GE1/1 Muon Upgrade and Lessons Learned From the Slice Test During the 2017-2018 LHC Runs
2020
Proceedings of Topical Workshop on Electronics for Particle Physics — PoS(TWEPP2019)
unpublished
In this contribution, we will present the status of the readout electronics system for the triple-GEM detectors of the GE1/1 system, an upgrade which is being installed into the CMS experiment during the present LHC long shutdown (LS2) in 2019-2020. We will also report on the lessons learned from the ten slice test detectors which have been installed in CMS since 2017 and represent the first time that such large triple-GEM detectors have been operated within the LHC environment, and on the