Remotely operated vehicle-based methodology for the reduction of costs and operational delays associated with rock dredging for channel deepening
2021
Holos
Rock dredging for river channel deepening presents problems concerning the identification of whether the blasted rock is properly fragmented for the following operations and whether the excavation and disposal reach the determined project level. These issues lead to decision making that involves expensive equipment and vessel movement procedures that can result in an increase in costs and time. After characterizing and analyzing all underwater blasting and rock excavation procedures, a new