A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Bim Application in the Operation and Maintenance Management of a Sports Infrastructure
2020
Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC)
unpublished
Operation and Maintenance (O&M) stage is the most expensive phase during the life cycle of a building. Currently, much of the information used in there is still paper-based and is delivered to the owner months after the facilities are in use. Therefore, it is necessary to study the interaction between Lean principles and Building Information Modeling(BIM) Functionalities in the building during O&M phase to optimize resources. This paper proposes a BIM-FM workflow and compares it with
doi:10.24928/2020/0015
fatcat:rdi2ucmrdfdhrgjygxf7rzmtma