A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
BPMs with Precise Alignment for TTF2
2004
AIP Conference Proceedings
Design and technology of the new, standardized BPM-system for the warm sections of the TESLA Test Facility phase II (TTF2) are presented. Stripline-and button-BPM pickups are read-out with an upgraded version of the AM/PM BPM-electronics of TTF1. The Stripline-BPMs are fixed inside the quadrupole magnets. A stretched wire measurement was used to calibrate the electrical axis of the BPM wrt. to the magnetic axis of the quadrupole.
doi:10.1063/1.1831144
fatcat:2tbhprm3angapdxfakvtyxec54