Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir
2020
Geofluids
For deep-water faulted sandstone reservoirs, the general practice is to design long horizontal wells improving well productivity. During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately. Furthermore, multisize chokes are often utilized in a shorten test time for loosen formation, high test cost, and high well productivity. Nevertheless, the conventional productivity evaluation approach cannot accurately evaluate the well
doi:10.1155/2020/8845270
fatcat:4cdxxsekcfdbvb7cxik6iwzw6u