A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2014; you can also visit the original URL.
The file type is application/pdf
.
Evolutionary Multi-Objective Day-Ahead Thermal Generation Scheduling in Uncertain Environment
2013
IEEE Transactions on Power Systems
This paper addresses day-ahead thermal generation scheduling as a realistic multi-objective optimization problem in an uncertain environment considering system operation cost, emission cost and reliability as the multiple objectives. The uncertainties occurring due to unit outage and load forecast error are incorporated using loss of load probability (LOLP) and expected unserved energy (EUE) reliability indices. For solving the above-mentioned scheduling problem, a multi-objective generation
doi:10.1109/tpwrs.2012.2222939
fatcat:v73nzsnyhvcobly5vepezifcia