Stress-Assisted Corrosion in Boiler Tubes [report]

Preet M Singh, Steven J Pawel
2006 unpublished
Weyerhaeuser). A. Willoughby (ORNL) managed photography and specimen handling for the SAC investigation. Tube panels were flame cut longitudinally into manageable sections for handling by L. Smarsh (ORNL). Circumferential wave inspections were performed by M. Cooper, J. Gustafson, and S. Shankles (Longview Inspections). Longitudinal wave inspections were performed by M. Quarry (Lawrence Livermore National Laboratory) and J. Brignac (Alstom Power). Radiographic inspections were performed by R.
more » ... e performed by R. Sweet and C. Culbertson (Longview Inspections). Following the various inspections, tubes were saw cut into sections to facilitate visual inspections and metallographic sampling by B. Gaskin (ORNL). H. Longmire (ORNL) prepared and photographed the metallography specimens. L. Walker (ORNL) performed the SEM and microprobe analyses. Along with P. Singh
doi:10.2172/882855 fatcat:ymsin5uqc5cuzgetkebuvqgqf4