Aspen Plus Simulation of CO2 Removal from Coal and Gas Fired Power Plants
2012
Energy Procedia
This paper presents a description of the CO 2 removal process of 500MW coal and gas fired power plants. The parameters and other operating conditions for Aspen Plus rate based model were selected to achieve 85% of CO 2 removal. The effects of absorber pressure and packing height on re-boiler duty are studied. Re-boiler duty is decreasing with the increase of packing height and absorber pressure. The effect of solvent properties on CO 2 removal efficiency is also analyzed. The removal efficiency
doi:10.1016/j.egypro.2012.06.060