A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Cost Optimization of a Zero-Emission Office Building
2020
Buildings
The cost-effectiveness of energy efficiency measures meant to achieve a zero-emission office building is investigated and compared to business as usual energy efficiency measures. The laboratory for zero emission buildings, the ZEB Lab, located in Trondheim, Norway, is an office building designed and built to compensate its lifecycle emissions with the use of a large array of building-integrated photovoltaic panels, pursuing a zero-emissions ambition level. Three design alternatives are
doi:10.3390/buildings10120222
fatcat:pnuy4bu4t5dxjerbqssmudilpq