A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
Development and Performance Evaluation of a Selective Plugging System for High-Temperature and High-Salinity Water-Bearing Gas Reservoir
2022
Processes
In the development of natural gas reservoirs, the water produced in wells will cause a decline in gas well productivity. In this study, a selective frozen gel plugging agent system suitable for water plugging in gas reservoirs under conditions of high temperature and high salinity. The plugging capacity of the gel system was evaluated. The experimental results showed that: (1) the optimal experimental scheme of the frozen gelling system was as follows: 107 °C with 1.0% AM-AMPS +0.6%
doi:10.3390/pr10101904
fatcat:66wi5bhhpfbj7ohyux2twdqn7a