Rehabilitation of Indian Creek Watershed Structure #2
2005
2005 Tampa, FL July 17-20, 2005
unpublished
The Indian Creek PL-566 Watershed project area includes 4,700 acres located north of Council Bluffs city limits in Western Iowa. Indian Creek Site 2 was constructed in 1975 with a low hazard rating to control grade and reduce sediment loading downstream. Site 2 formed an initial total sediment pool of 29 acres in two adjacent gullies. Water is allowed to flow between the two pool areas through six culverts in the upstream berm area and beneath a private access road. The structure has been