The Fusion Test Facility (FTF) is a high repetition rate ignition facility that would bridge the gap between single shot facilities (such as NIF and LMJ) and a fully functioning laser fusion power plant. It would allow development of science and technologies so that follow-on power plants could have predictable performance. The FTF would need to have enough fusion power, about 100 MW, to rigorously test materials and components for the power plants. Because inertial fusion provides a "point"
more »
... rce for neutrons, it can provide very high fluxes for test objects placed close to the target, while the reaction chamber walls remain at conservatively large distances. Simulations indicate that direct-drive designs can achieve 100 MW fusion power with laser energies well below 1 MJ with a 5 Hz driver. High-resolution 2-D simulations of high-velocity direct-drive implosions utilizing a Krypton-Fluoride (KrF) laser give gains of >60× at 500 kJ, and shock-ignited targets may allow higher gains at even lower driver energy. Utilizing designs that require relatively small driver energy is the most straightforward path to reducing cost and development time for a practical laser fusion energy power plant. A program to develop an FTF would build upon the science and technologies developed in the existing National Ignition Campaign and the High Average Power Laser (HAPL) program, as well as the magnetic fusion technology program. Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as Report (SAR) 18. NUMBER OF PAGES 10 19a. NAME OF RESPONSIBLE PERSON a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18
doi:10.13182/fst56-594
fatcat:ni2xq5vawzeuneoweldfitkfui