A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Atbara Water Current Turbine International Journal of Engineering & Computer Science (IJECS).pdf
2018
Figshare
The motivation that led to the writing of the present paper is the necessity to exploit the high-velocity energy of River Nile that obtained when River Atbara meets River Nile in Atbara town which is located in River Nile State. At the junction of the two rivers high-velocity energy is gained, and therefore, a suitable energy converter is needed to utilize this abundant energy. This research paper is a continuation of a series of researches executed by the Faculty of Engineering and Technology
doi:10.6084/m9.figshare.7472198.v1
fatcat:vokgaxpvdjekpclonjhphtb334