A performance-based Pavement Management System for the road network of Montreal city—a conceptual framework
[chapter]
2014
Asphalt Pavements
Arterial roads of Montreal city, mostly constructed in 1950's, are at an advanced state of deterioration and need major rehabilitation, upgrading, or even reconstruction. City of Montreal has allocated over $1.6 billion for road infrastructure in its 2012-2014 Three-year Capital Work Program. This investment can be wasted without proper infrastructure asset management system. The current practice of mill and asphalt overlay method by City of Montreal to rehabilitate the pavement is inadequate
doi:10.1201/b17219-36
fatcat:op5csuhkrvcs3fmqynciub564m