Short-Term Optimal Operation of Baluchaung II Hydropower Plant in Myanmar
2020
Water
The short-term optimal operation model discussed in this paper uses the 2016 to 2018 daily and monthly data of Baluchaung II hydropower station to optimize power generation by minimizing water consumption effectively in order to get more revenue from optimal operation. In the first stage, run-off-river type Baluchaung II hydropower station data was applied in a mathematical model of equal micro-increment rate method for optimal hydropower generation flow distribution unit results. In the second
doi:10.3390/w12020504