A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
Wood mass clogging of hydroelectric power plants reservoirs in forested areas
Засорение древесной массой водохранилищ гидроэлектростанций, построенных на покрытых лесом землях
2022
FORESTRY BULLETIN
Засорение древесной массой водохранилищ гидроэлектростанций, построенных на покрытых лесом землях
The paper analyzes the design peculiarity and construction of hydroelectric power plants in Siberia and the Far East, it also identifies environmental, economic and social problems, it presents the study results of the volumes of wood planned (design) and actually flooded in the beds, as well as being afloat in the water area of the Angara–Yenisei reservoirs region. The study identified the reasons for leaving significant amounts of tree and shrub vegetation in the zones of flooding of
doi:10.18698/2542-1468-2022-2-36-43
fatcat:va52cgn67jdlthektzh54hbsva