Rehabilitating a Life Line: Inspecting and Repairing the Hultman Aqueduct in Metropolitan Boston
2011
Pipelines 2011
unpublished
The Massachusetts Water Resources Authority (MWRA) provides water to over 2.2 million people and 51 communities serving greater Boston and central Massachusetts. They are undertaking a $57 million construction project to rehabilitate the 13.4-mile long, 11.5-foot diameter Hultman Aqueduct, including: inspection and repair of the existing aqueduct pipe and construction of several large diameter valve chambers to house connections between the existing Aqueduct and the new MetroWest Tunnel. This