In Situ Load Testing of Parking Garage Reinforced Concrete Slabs: Comparison between 24 h and Cyclic Load Testing
2005
Practice Periodical on Structural Design and Construction
This paper reports on the results obtained on the applicability of the diagnostic cyclic load test method in comparison with the existing 24 h test procedure adopted in ACI-318. A parking garage, owned by St. Louis County, St. Louis, Missouri, scheduled for demolition during the summer of 2002 was used as a research test bed before demolition. This structure, a two-story steel and reinforced concrete (RC) frame with one-way RC slabs built in 1970's, was ideal, in terms of size and construction