A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL.
The file type is application/pdf
.
ON THE DEMAND OF PLANNING THE IMPLEMENTATIONOF MEASURES FOR PRODUCTION STIMULATION BY APPLYING HYDROCHLORIC ACID SOLUTION IN THE REAL TIME MODE
2017
Oil and Gas Studies
The authors of the paper observed considerable effect on performance time factor based onthe experience of bottom hole zone treatment with the use of hydrochloric acid solution preventing emulsification. The paper presents models and algorithms allowing planning effectiveness, choice of wells and technologies considering this factor in the real time mode.
doi:10.31660/0445-0108-2017-3-66-71
fatcat:c2grcdfctrgy3dlhr62zazvbzm