A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
ISIS TS1 Project target – design for manufacture
2018
Journal of Physics, Conference Series
The planned upgrade for the ISIS Spallation Neutron Source First Target Station requires a complete redesign of the Target, Reflector and Moderator (TRaM) system whilst working within the constraints set by the existing Void Vessel and target station infrastructure. This talk focusses on converting the optimised simulated design for the TS1 project target into a physical reality that will be robust and give a reliable service life equal to or greater than the existing TS1 Target (>5 yrs). ISIS
doi:10.1088/1742-6596/1021/1/012056
fatcat:7xcioc4benbkrdrcts6rpp2qbu