A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2018; you can also visit the original URL.
The file type is application/pdf
.
An efficient tie-line ATC calculation method with N-1 contingencies
2014
International Journal of Smart Grid and Clean Energy
Keywords: Power system, transient stability, available transfer capability, transient energy, critical clearing time * Manuscript
doi:10.12720/sgce.3.2.179-185
fatcat:b7f4veof6bdpjfk64zwqb53nuy