Notes on the Mainline Apollo SCB Meeting #37, Held at MSC on Deletion of Time of Longitude (P29) Saves

K Greene, Words Apollo, Luminary Id
1970 unpublished
APOLLO 13 LUMINARY 1C It was announced at the meeting that two of the erasable load parameters that had been in question for Apollo 13 had been set as follows: HLROFF = 50 FT DLQFIX = 400 FT The problem of velocity errors seen on the cross-pointers at GAC upon entering Auto-P66 was discussed. MIT was given an action item to see if the problem of the cross-pointer errors could be cleaned up for future flights.