A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
Optimization of Scheduling in FMS using Heuristic Approaches: A Case Study
2018
International Journal of Trend in Scientific Research and Development
The flow shop scheduling problems are experiencing a huge eminence in this modern era of industrialization. In the present scenario we find almost every industry to be focusing prominently on the scheduling of the machines working in them, as it is a significant factor in deciding the net productivity. Nowadays almost each and every manufactur system is involved in following a preplanned schedule of machine operation considering the demand criterion put forth. Flexible manufacturing system
doi:10.31142/ijtsrd14336
fatcat:usmycyntrbhqzcxzqyo7qwv2zm