Comparison of the NSLS-II Linac Model to Measurements

Raymond Fliller, Petit-Jean-Genaz, Christine (Ed.), Arduini, Gianluigi (Ed.), Michel, Peter (Ed.), Schaa, Volker RW (Ed.)
2014
The NSLS-II linac and associated transport lines were successfully installed and commissioned in the spring of 2012. Various beam measurements were performed to ensure that the linac met specifications and would be a suitable injector for the NSLS-II booster. In this paper we discuss the outcomes of these measurements and compare them to the model of the NSLS-II linac.
doi:10.18429/jacow-ipac2014-wepro019 fatcat:dr2lp4wownbcrpmecsp4u7xupu