A stochastic mathematical model for determination of transition time in the non-simultaneous case of surface and underground mining

E. Bakhtavar
2017 Journal of the Southern African Institute of Mining and Metallurgy  
doi:10.17159/2411-9717/2017/v117n12a9 fatcat:lzhn5mwiafanfjah435awhqyqe