Joint optimization of maintenance, buffers and machines in manufacturing lines
2017
Figshare
This article considers a series manufacturing line composed of several machines separated by intermediate buffers of finite capacity. The goal is to find the optimal number of preventive maintenance actions performed on each machine, the optimal selection of machines and the optimal buffer allocation plan that minimize the total system cost, while providing the desired system throughput level. The mean times between failures of all machines are assumed to increase when applying periodic
doi:10.6084/m9.figshare.4793425.v1