A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2018; you can also visit the original URL.
The file type is application/pdf
.
Accelerator Shutdown Report
2014
This report describes the main service and upgrade measures of the GSI accelerator facility in 2013. The presented information is based on the work of the shutdown coordination and the corresponding MS-Project shutdown planning.
doi:10.15120/gr-2014-1-fg-cs-01
fatcat:ih7u3pmrxrd6zho42fj5v3x7dm