Accelerator Shutdown Report

S. Reimann, U. Scheeler
2014
This report describes the main service and upgrade measures of the GSI accelerator facility in 2013. The presented information is based on the work of the shutdown coordination and the corresponding MS-Project shutdown planning.
doi:10.15120/gr-2014-1-fg-cs-01 fatcat:ih7u3pmrxrd6zho42fj5v3x7dm