PREPARATION OF PREQUALIFICATION SYSTEM FOR INDIAN ROAD PROJECTS BASED ON DEA TECHNIQUE
unpublished
The study shows the modification of existing prequalification system and why it needs to be modified. The contractor plays a vital role in the execution of the project and achieving the desired aim of the project. Selecting the appropriate and competent contractor comes out to be challenging for the decision maker or the selecting authority. To make sure that the bidding is done by the eligible bidders prequalification system is processed. In India we follow the L1 concept means the bidder who