A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Doing More with Less: Application to Transmission Structures
2017
Open Civil Engineering Journal
Common theme within the electric utility industry is doing more work with fewer resources. Shrinking staff resources and budgets create challenges in light of the continuing strong investment required for national lifeline infrastructure projects. Methods: The presentation will define and address one traditional type of waste -overproduction, particularly applied to the design of electric utility transmission structures. Results and Conclusion: It will illustrate a variety of typical design
doi:10.2174/1874149501711010768
fatcat:xjxzup72izhmniqg666i2ufxzm