Commissioning of BPM System for the TPS Project
2016
Beam position monitor system for TPS (Taiwan Photon Source) project include several different kinds of button BPMs distributed at transfer line and booster synchrotron booster, and the storage ring. All BPM equip with commercial Libera single-pass BPM electronics and Libera Brilliance⁺ BPM electronics. Commissioning of the TPS accelerator system start in late 2014 for phase I commissioning until the first quarter of 2015. Phase II commissioning equip with SRF and insertion devices is schedule