A two-stage dynamic model on allocation of construction facilities with genetic algorithm
2004
Automation in Construction
By their very nature, activities within the construction site are generally highly dynamic and complex. Hence it is highly desirable to be able to formulate the optimal strategy for allocating site-level facilities at different times of the project. The principal objective is to minimize the total cost, which comprises the transportation, handling, capital, and operating costs at potential intermediate transfer centers of various plant and material resources over the entire project duration.