Simple computer models of the construction process

Munther M. Saket, Kenneth J. McKay, R. Malcolm W. Horner
1986
An accurate cost model of the construction process is a pre-requirement for optimising designs and controlling project costs. British bills of quantities are too long and complex to serve this purpose effectively. Our research has shown that on average, 80% of the value of a bill is contained in that 20% of items whose value is greater than the mean. We have therefore been able to derive simple models of the construction process which are as accurate as but far shorter than conventional bills
more » ... quantities. Their use drastically reduces the resources needed for cost estimating and project control. RÉSUMÉ Un modèle précis des coûts dans le processus de construction est nécessaire afin de réaliser une conception optimale et de contrôler les coûts du projet. En Grande-Bretagne, les bordereaux de prix sont trop longs et complexes pour atteindre ce but efficacement. Notre recherche a démontré qu'en moyenne 80% de la valeur d'un bordereau de prix est englobé dans les 20% des articles ayant une valeur supérieure à la moyenne. Nous avons donc établi des modèles simples pour le processus de construction, aussi précis mais plus rapides que les devis conventionnels. Leur usage réduit considérablement les ressources requises pour l'estimation des frais et le contrôle du projet.
doi:10.5169/seals-41113 fatcat:gjfhzeyp25c75c3r7n773wp32y