Rapid Production Changes through the Coordination of Factory Layout Models and Activities
2013
Journal of Applied Mechanical Engineering
Changing the design of a factory in practice involves the change of a number of parallel and interdependent systems such as the machining resources and robot cells, the supply systems for electricity, water, air, heat and cooling, pneumatics and hydraulics, the systems for chip and waste handling, process fluid, communication networks, sprinkler systems, as well as the building construction. Thus the coordination of information and models, as well as of the design work activities, is of utmost
doi:10.4172/2168-9873.1000126