BIM technology in geotechnical engineering in terms of impact high building "Mogilska Tower" in Cracow of existing building development
2017
Technical Sciences
The article presents the use of BIM design method in geotechnical issues. BIM was used in the modeling of high building "Mogilska Tower" in Cracow. The object, as one of the few in Cracow, will have three underground storeys. High building with underground levels requires checking the impact of the implementation of a deep excavation on existing buildings. Analysis of settlement impact caused by deep excavation and the planned load of the building is based on the guidelines contained in the ITB