Cost Saving by the Use of SCOS-2000 for S/C Checkout and S/C Control

R. Patrick, H. Kubr, F. Croce, S. Valera, G. Montrone
2002 SpaceOps 2002 Conference   unpublished
The construction of the Space Segment and the construction of the Ground Segment have traditionally been split very early in the development phase of Space Systems. This approach has proved successful in launching many space projects. However, some people claim that this is as much driven today by the characteristics of the organisations that are building the system rather than technical or programmatic constraints. There is a lot of information produced during the space segment construction
more » ... ent construction which has to be reflected in the ground segment in order to perform successful satellite operations.
doi:10.2514/6.2002-t2-11 fatcat:lrob7u2iina4vbqe5bxx2hu6oy