NEG coating of pipes for RHIC: An example of industrialization process
2007
2007 IEEE Particle Accelerator Conference (PAC)
Non Evaporable Getter (NEG) coated chambers have been used in various accelerators facilities and synchrotrons for several years. Initially, NEG coated chambers were mounted in small amounts in specific locations, covering a minor fraction of the accelerator surfaces exposed to vacuum. More recently, NEG coated chambers have been adopted to a larger degree in several projects, contributing to a larger extent to the machine performance. LHC, whose commissioning is expected in 2007, will use 6 km
doi:10.1109/pac.2007.4440162