DUGOTRAJNO PRAĆENJE MOSTOVSKE KONSTRUKCIJE
2017
Zbornik Radova Građevinskog Fakulteta
For highway in the city of Žilina, the same twin parallel precast box girders were used with main spans of 60.5 m for a total length of 1042 m, where the same cross section was castoff throughout the bridge. The 60-ton segments were precast in an existing yard and delivered by trailers. They were lifted into place by a self-launching gantry placed on the previously completed portion of the deck. In order to assure the safety under construction of bridges, strain and temperature observation at
doi:10.14415/konferencijagfs2017.001