Upgraded Control System for LHC Beam-Based Collimator Alignment

Gianluca Valentino, Guillaume Baud, Marek Gąsior, Stephen Jackson, Lars Jensen, Jakub Olexa, Stefano Redaelli, Jorg Wenninger, Corvetti, Lou (Ed.), Riches, Kathleen (Ed.), Schaa, Volker RW (Ed.)
2015
In the Large Hadron Collider (LHC), over 100 movable collimators are connected to a three-tier control system which moves them to the required settings throughout the operational cycle from injection to collision energy. A dedicated control system was developed to align the collimators to the beam during machine commissioning periods and hence determine operational settings for the active run. During Long Shutdown 1, the control system was upgraded to allow beam-based alignments to be performed
more » ... nts to be performed using embedded beam position monitors in 18 newly installed collimators as well as beam loss monitors. This paper presents the new collimation controls architecture for LHC Run II along with several modifications in the Java-based application layer.
doi:10.18429/jacow-icalepcs2015-mopgf099 fatcat:2zen4zdxivd45iud4xhm7rtj5u