A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2021; you can also visit the original URL.
The file type is application/pdf
.
Concrete Creep Strain Monitoring and Analysis of Prestressed Hydraulic Tunnel
2018
Chemical Engineering Transactions
Based on the actual engineering monitoring data, the concrete creep change during the operation period of the prestressed hydraulic tunnel is analyzed, and it's calculated theoretically by using the existing concrete creep prediction model which has a wide range of application. The results of the study indicate that, within six months after the project enters the operating period, the strain changes generated by the concrete strain meter tend to be stable, and the strain increment at this time
doi:10.3303/cet1866208
doaj:47d67d9b178144588bb11e40513818a4
fatcat:ub4orbavpndtpk4sgp22w2uawe