Pengurangan Lead Time Analisa Kemasan Primer Flexy Bag dengan Metode Single Minute Exchange of Dies (SMED) di Industri Farmasi X
2020
Jurnal Inkofar
Waste of time in the packaging analysis process can cause delays in the production process. This condition affects the speed in meeting consumer demand. Calculation of lead time analysis of packaging is important to calculate so that the release of packaging for production can be on time. In previous studies, an improvement that can be used to minimize waste is to reduce the internal set-up time to an external set-up using the single minute exchange of dies (SMED) method. This research was