A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL.
The file type is application/pdf
.
Aggregate overhaul and supply chain planning for rotables
2013
Annals of Operations Research
We consider the problem of planning preventive maintenance and overhaul for modules that occur in a fleet of assets such as trains or airplanes. Each type of module, or rotable, has its own maintenance program in which a maximum amount of time/usage between overhauls of a module is stipulated. Overhauls are performed in an overhaul workshop with limited capacity. The problem we study is to determine aggregate workforce levels, turn-around stock levels of modules, and overhaul and replacement
doi:10.1007/s10479-013-1426-0
fatcat:7ahmeygj4reghhwvh3ucrqlmk4