A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2018; you can also visit the original URL.
The file type is application/pdf
.
PREDICTION OF DRILLING TORQUE FOR FULL DISPLACEMENT PILE CONSTRUCTION IN LOOSE SOIL USING NEURAL NETWORKS
unpublished
The paper is aimed at developing a neural network model for predicting the drilling torque necessary to push a drill bit in to the subsurface during the installation of full displacement pile (FDP) based on the cone resistance value of the subsurface. A self-evolving network algorithm is employed developing the model in order to reduce the model complexity without compromising accuracy. The database used to construct and validate the model consists of measurements taken during a drilling
fatcat:nadnbkh5bbeuhcszacupvk4fhu