Developmental Constraints Adversely Affecting New Entrants Into the Construction Industry of the Limpopo Province of South Africa

2013 China-USA Business Review  
 Although political transformation has occurred in South Africa in April 1994, the pace at which economic transformation has occurred has been slow. A review of the literature has shown that economic transformation has been slowed by an acute shortage of technical skills among Black South Africans working in business, government, and industry. A case in point is the construction industry of Limpopo Province of South Africa in which emerging contractors have failed to compete adequately with
more » ... adequately with well-established contractors in the construction industry due to shortage of technical skills, capital, and lack of access to markets. The study is based on a random sample of 104 emerging contractors operating in the Province of Limpopo. A combination of quantitative and qualitative methods of data collection and analyses was used in the study in order to identify and quantify key obstacles to growth and development in emerging contractors. Eigen values estimated from factor analysis showed that the viability of emerging contractors in the construction industry of Limpopo Province was significantly influenced by three factors (lack of entrepreneurial skills, lack of capital, and lack of transparency in the award of construction tenders). Based on results obtained from multilevel analysis, differences among the five districts of Limpopo Province accounted for 13.18% of the total variation in viability. Differences in entrepreneurial skills between viable and non-viable businesses accounted for 33.49% of total variation. Findings of the study show that entrepreneurial skills are no less important than financial capital for ensuring viability in emerging contractors currently operating in Limpopo Province. The study has also found that the fundamental principles of good governance such as transparency and accountability are not adhered to in the administration and award of government tenders, and that this predicament was working to the detriment of emerging contractors in the province.
doi:10.17265/1537-1514/2013.08.006 fatcat:ycnc6yttivcc7j3vhgy3a74lti