Scheduling Hot Slabs in Parallel Hot Rolling Production Lines by Column Generation
2014
ISIJ International
This paper is to determine the slab schedule on parallel hot rolling lines with consideration of chain precedence constraints, which restricts the slabs belonging to a chain to be successively processed without interruption in one production line. Moreover, energy loss increases as its waiting time before being processed increases, since the slabs dynamically arrive with high temperature. The objective of the problem is to minimize the total energy loss costs. Two kinds of energy loss cost that
doi:10.2355/isijinternational.54.2837