A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Environmental Approaches during Planning and Construction Stages of Hydropower Projects in Mexico
2015
Journal of Environmental Protection
During the Environmental Impact Assessment procedure (EIA) for hydropower projects, apart from the compliance with environmental standards and regulations, important environmental and ecosystem changes are foreseen from planning and construction stages. In Mexico, the EIA and environmental standards are being systematically applied and fulfilled at planning and construction stages for hydropower projects. These are mainly related to control air emissions, solid and hazardous wastes, water
doi:10.4236/jep.2015.610106
fatcat:eq5tbecdq5cejer4xn4ecdpl5a